Delhi metro

  1. Delhi Metro: Map, Route, Stations, Pass & Updates [2023]
  2. India: average daily ridership of public transport in Delhi 2021
  3. Delhi Metro map pdf 2022, routes, fares, Delhi metro train timings, latest updates on Delhi Metro
  4. Yahoo forma parte de la familia de marcas de Yahoo
  5. Delhi Metro Phase 4: Route Map, Status Update & Tenders [2023]


Download: Delhi metro
Size: 26.37 MB

Delhi Metro: Map, Route, Stations, Pass & Updates [2023]

Delhi Metro – Information, Route Maps, Fares, Tenders & Updates Menu: Information Delhi Metro is an urban Mass Rapid Transit System (MRTS) built with 10 lines and 253 stations to serve India’s capital along with other towns in the National Capital Region (Gurgaon, Noida and others) by the Delhi Metro Rail Corporation (DMRC). Construction for its 65.1 km Barring a 1.5 km stretch of the Airport Express Line, the 162.495 km DMRC began the bidding process for the construction of the 65.1 km (and growing) System Specifications • Top Speed: 80 kmph • Average Speed: 34 kmph • Track Gauge: Broad Gauge: 1676 mm (lines 1-4) and Standard Gauge: 1435 mm (lines 5-9) • Electrification: 25 kV, 50 Hz AC OHE • Signalling: Cab Signalling/Distance to Go (lines 1-6), CBTC (lines 7-9) Key Figures Operational: 349 km | Under Construction: 66.98 km| Proposed: 57.3 km • Daily Ridership: 47.3 lakh/day (September 2022) • Rolling Stock: 2214 coaches (see detailed table at the bottom) Operational Lines ( • Line-1– Red Line:Rithala – Shaheed Sthal (34.69 km, 29 stations) • Line-2– Yellow Line: Samaypur Badli – HUDA City Centre (49.31 km, 37 stations) • Line-3– Blue Line: Dwarka Sec 21 – Noida Electronic City (56.61 km, 50 stations) • Line-4– Blue Line: Yamuna Bank – Vaishali (8.74 km, 8 stations) • Line-5– Green Line: Mundka – Brigadier Hoshiyar Singh (29.64 km, 23 stations) • Line-6– Violet Line: Kashmere Gate – Raja Nahar Singh (46.63 km, 34 stations) • Line-x– Airport Express Line: New Delhi – Dwar...

India: average daily ridership of public transport in Delhi 2021

In financial year 2021, more than two million passengers rode buses in Delhi daily, while around 0.9 million passengers rode metro daily the same year. They were a huge decrease in comparison with the previous year due to the impact of Covid-19 pandemic. Delhi was one of the most congested cities in the world. Several new metro routes were under construction, and the government was planning to invest more in the public transport section, which would increase passenger traffic and improve the traffic congestion. The most important statistics • Cost for public transport in cities worldwide, 2018 • Urban rail development worldwide 2014-2018 • Metro developments worldwide 2018 • Length of urban road in India FY 2001-2019 • Road length across major metropolitan cities in India 2021 • Budget allocation for roads and highways development India FY 2017-2024 • Proposed investment value in the transportation industry in India 2011-2022 The most important statistics • Public and private sector buses in India FY 2001-2019 • Electric bus fleet size in India 2021, by city • Number of buses in Delhi India 1988-2021 • Number of registered buses in Mumbai, India 2016-2022 • Number of registered buses in Bengaluru, India FY 2018-2021 • Number of registered buses Kolkata, India 2021, by type The most important statistics • Total metro systems in the world 1990-2018 • Operational metro rail length in India 2021, by city • Metro rail length under construction in India 2021, by city • Suburban ...

Delhi Metro map pdf 2022, routes, fares, Delhi metro train timings, latest updates on Delhi Metro

The Delhi Metro is an urban Mass Rapid Transit (MRT) system serving Delhi-NCR regions including the cities of Ghaziabad, Faridabad, Gurgaon, Noida, Bahadurgarh, and Ballabhgarh. With a constructed network of 390.14 Km with 286 stations (including Noida-Greater Noida Corridor and Rapid Metro, Gurugram), the Delhi Metro is the largest and busiest metro network in India. The Delhi Metro Rail Corporation Limited (DMRC) was first registered on 3rd May 1995 with equal equity participation of the Government of the National Capital Territory of Delhi (GNCTD) and the Central Government to implement the dream of construction and operation of a world-class Mass Rapid Transport System (MRTS). The The development of the Delhi Metro network was divided into phases. Phase I with 3 lines was completed by 2006, and Phase II by 2011. Phase III reached its finishing stage by the end of 2020. The construction of Phase IV was formally started on 30 December 2019. Delhi Metro Route Map 2022 PDF Download The Delhi Metro has 12 operational metro lines: Blue line, Red line, Yellow line, Pink line, Green line, Violet line, Aqua line, Magenta line, Grey line, Orange line, and Rapid metro line. Out of these three extensions of the Grey line, the Magenta line and the Pink line, respectively are under construction. Delhi Metro operational lines (Phase1, Phase 2, Phase 3) Delhi Metro Red line All Stations The Delhi Metro Red line covers a distance of 33.48 km, with 29 stations from Shaheed Sthal (New Bu...

Yahoo forma parte de la familia de marcas de Yahoo

Si haces clic en « Aceptar todo», nosotros y • mostrar anuncios y contenido personalizados basados en perfiles de interés; • medir la efectividad de los anuncios y el contenido personalizados, y • desarrollar y mejorar nuestros productos y servicios. Si no quieres que nosotros ni nuestros socios utilicemos cookies y datos personales para estos propósitos adicionales, haz clic en « Rechazar todo». Si quieres personalizar tus opciones, haz clic en « Gestionar configuración de privacidad». Puedes cambiar tus opciones en cualquier momento haciendo clic en el enlace «Configuración de privacidad y cookies» o «Panel de control de privacidad» de nuestros sitios y aplicaciones. Para obtener más información sobre cómo utilizamos tus datos personales, consulta nuestra

Delhi Metro Phase 4: Route Map, Status Update & Tenders [2023]

Delhi Metro Phase 4 – Information, Route Maps, Tenders & Updates Menu: Phase IV Information Delhi Metro Phase 4 project’s routes with 6 lines totaling 103.93 km within Delhi’s borders were Tendering for Phase 4’s civil construction began in June 2019, with piling work on Line-8’s extension In December 2020, DMRC Delhi Metro Phase 4’s Priority Corridors are expected to be completed and opened in June 2026 much later than its deadline of December 31, 2024. • DMRC’s Phase 4 Deadline: December 31, 2024 (Priority Corridors) • My Completion Estimate: 2026 (Priority Corridors) • Estimated Project Cost: Rs. 24,948.65 cr • Revised Funding Pattern (December 2019) – Central Government (GOI): Rs. 4,643.638 cr – Delhi Government (GNCTD) & other sources: Rs. 7,374.098 cr – External Loan: Rs. 12,930.914 cr Phase 4 Approved New Lines Line-10 – Silver Line: Aerocity – Tughlakabad • Length: 23.622 km • Type: Elevated (4.279 km) & Underground (19.343 km) • Depot: Sarita Vihar (shared with Violet Line) & possibly Vasant Kunj • Number of Stations: 16 • Station Names: Aerocity, Mahipalpur, Vasant Kunj, Kishangarh, Chhatarpur, Chhattarpur Mandir, IGNOU, Neb Sarai, Saket G-Block, Ambedkar Nagar, Khanpur, Sangam Vihar, Maa Anandmayee Marg Junction, Tughlakabad Railway Colony (Pul Prahaladpur) and Tughlakabad Phase 4 Approved Extensions Line-7 – Pink Line: Mukundpur – Maujpur • Length: 12.558 km • Type: Elevated (12.58 km) • Number of Stations: 8 • Station Names: Burari Crossing, Jagatpur Village, ...