Uppcl connection list

  1. Documents Required for Electricity Connection
  2. Commercial Unit
  3. Electrical Material Rate List UPPCL


Download: Uppcl connection list
Size: 48.4 MB

Documents Required for Electricity Connection

CLICK ON THIS LINK The connection shall be given to the applicant within 30 days of application submission but these days of releasing connection can be varying from state to state. • If premise lies within 40 meters from the nearest LT pole • If the premise lies beyond 40 meters from the nearest LT pole If the premise lies within 40 meters from thenearest LT pole • All dues must be cleared on-premise. Means The application shall be processed by the department on clearing of dues. • There should not be any court case/ dispute on the land of the premise. • The applicant is required to fill in all information in the Application form like name, address, load, etc. for new connections. Along with the above form, the following documents are required for electricity connection- Documents Required for Electricity Connection (i) Applicant is required to submit (ii) Any Approval / NOC of the local authority, if required under any personal office law. (iii) In the case of a partnership shop/firm, the document of agreement of partnership is required. (iv) In case of a Limited Company firm applied for connection licensee need Memorandum, Articles of Association, Certificate of incorporation and list of all Director’s, MD / certified addresses. (v) Work completion and Test certificate also called B & L Form, on the standard form given by the licensed electrical contractor can be submitted later but before the commencement of new connection. (vi) Owner’s consent and NOC for getting new ...

Commercial Unit

Sr. No. Download Order No. Description 1 Rejoinder against Counter Affidavit of UPPCL in Re-Submission MYT 2019-24 Petition of 1X110 MW Harduaganj Size : 3.6 MB | Lang : English | 2 Rejoinder against Counter Affidavit of UPPCL in Re-Submission MYT 2019-24 Petition of 2X250 MW Harduaganj Ext Size : 2.27 MB | Lang : English | 3 Rejoinder against Counter Affidavit of UPPCL in Re-Submission MYT 2019-24 Petition of 1X660 MW Harduaganj Ext-II Size : 3.6 MB | Lang : English | 4 Rejoinder against Counter Affidavit of UPPCL in Re-Submission MYT 2019-24 Petition of 1X110 MW Parichha Size : 3.6 MB | Lang : English | 5 Rejoinder against Counter Affidavit of UPPCL in Re-Submission MYT 2019-24 Petition of 2X210 MW Parichha Ext TPS Size : 3.6 MB | Lang : English | 6 Rejoinder against Counter Affidavit of UPPCL in Re-Submission MYT 2019-24 Petition of 2X210 MW Anpara A Size : 3.6 MB | Lang : English | 7 Rejoinder against Counter Affidavit of UPPCL in Re-Submission MYT 2019-24 Petition of 2X500 MW Anpara B Size : 2.7 MB | Lang : English | 8 Rejoinder against Counter Affidavit of UPPCL in Re-Submission MYT 2019-24 Petition of2X500 MW Anpara D Size : 2.8 MB | Lang : English | 9 Rejoinder against Counter Affidavit of UPPCL in Re-Submission MYT 2019-24 Petition of 5X200 MW Obra B TPS Size : 3.0 MB | Lang : English | 10 Re-joinder of Parichha Ext-II against Counter Affidavit by UPPCL on UPRVUNL in compliance of Hon'ble UPERC Size : 3.1 MB | Lang : English | 11 Public Notice for Public Hearing b...

Electrical Material Rate List UPPCL

In UPPCL what is the cost of the material that is used in the time of construction of the LT line and HT line. For example, what is the rate of PCC pole, STP pole, and transformer? If one knows the cost of all the above-mentioned materials, then the cost of construction of the LT line and HT line can be calculated. in this article with the heading “Electrical Material Rate List UPPCL” we will describe the rate of Electrical material Price list During construction of lt and ht line material used in its construction are described with their price below- Sr. no. Particulars Unit (Rs.) Rate 1 P.C.C. Pole 8.5 M No. 2721 2 S. T.P. Pole No. 15049 3 Stone Pad 300x300x75 mm No. 140 4 L.T. Clamp with bolt & Nut No. 304 5 Earth wire clamp No. 304 6 L.T. Shackle insulator No. 36 7 Bolt & Nut for Shackle insulator Kg. 194 8 Loop guard complete 3-Phase No. 46 9 Loop guard complete 1-Phase No. 35 10 Phase wire ACSR Weasel Km. 23984 11 Neutral cum earth wire Kg. 142 12 Aluminium binding wire Kg. 247 13 Jointing Sleeve for Weasel No. 103 14 Spacer L.T. P.V.C. No. 80 15 Extra for stay at angle Location No. 1961 16 Concreting of support No. 856 17 Earthing complete No. 838 18 Concreting of stay No. 370 Cost of Distribution Transformer in UPPCL Here the cost of the transformer is indicated in the list below. But in some places, the cost of the transformer is indicated with a double pole system. For example, the cost of a 25 kVA only transformer is 56780 Rs. while the cost of a transformer wit...